Sierra Leone Project
Home » Project Case » Sierra Leone Project

On April 2, 2025, in the busy operation area of Tianjin Port, a batch of materials and accessories were neatly placed and were about to be shipped to Sierra Leone. The export materials have thousands of LED lights and a batch of special accessories for sprinkler truck.

Project Profile

LED lights use new energy-saving materials, high brightness and energy saving; sprinkler truck parts cover the core components such as sprinkler pump, power extractor and transmission device. The successful shipment of the materials and accessories has further strengthened the cooperation and mutual trust between our company and overseas customers.

 

From receiving orders to preparing goods to successful delivery, our company cooperated with the factory to optimize the production scheduling cycle, strictly guaranteed the quality and quantity of quality inspection, and ensured that the materials were delivered to Tianjin Port safely on time.

Quality Assurance

The successful shipment has further consolidated our cooperation with overseas customers. In the future, we will continue to make good products and services to help the cooperation to a new height.

The procurement of overseas engineering materials refers to the process in which the engineering contractor selects and purchases materials, equipment and materials to meet the needs of overseas engineering project.

Material Supply Process

How to ensure the legality of material supply for overseas projects?
22
Understand the materials needed for overseas engineering and find suitable suppliers in China.
22
Handle relevant customs declaration procedures, such as materials, construction equipment and living supplies in the contract, and provide relevant documents, including commercial invoice, export license and other relevant certificates, packing list, customs declaration, contract, etc. Prepare the documents required for customs clearance. If there are special requirements, provide relevant certificates to conduct certification, such as CCPIT certificate of origin, partial cargo certificate and third -party inspection certificate.
22
The most critical work for the compliance and legality of overseas project material procurement is to meet the needs of project, select strong logistics suppliers ,conduct inspection on the third party, and fully grasp the policy changes of the local customs.

How Does Mingyang Group Service

Browse Our Product Categories

  Bulldozer

  Excavator

  Paver

  Water Truck

  Dump Truck

  Mining Truck

   Tel:00852-56158988

  Email:my@ymo.hk

    Add:Room S032, 2/F, The Capital 61-65 Chatham Road South, Tsim Sha Tsui, Kowloon, Hong kong.

Project
Project Case
About Us