Uzbekistan Project
Home » Project Case » Uzbekistan Project

Purchaser: CHINA ROAD & BRIDGE CORPORATION, OVERSEAS BRANCH;TIME: 2021;Place: Uzbekistan;

Summary: Supply materials, control costs and shorten the delivery cycle for overseas projects in Uzbekistan.

Challenge Difficulties

Due to the long distance, time consuming and the wide variety of materials, the supply and export of materials are often the "bottleneck" restricting overseas engineering projects.

 

So it is very important to do a good job in the materials procurement of overseas projects.

Problems Solved

1. Due to the lack of supplies in Uzbekistan, most of the materials are basically imported, resulting in high price and supplies cannot be mass purchased in the local market. Based on the characteristics and requirements of overseas projects, we choose reasonable purchasing channels, for the Uzbekistan overseas engineering team supply generator set/boiler/instrument/ cement exhaust machine and help them control the engineering project material cost and ensure the smooth progress of overseas projects.


2.This batch of materials is urgent and varied .We choose ---Central Asia Freight Train with the highest cost performance and the shortest transportation time, which shortens the delivery period of 2-3 months and ensures that this batch of materials arrive at customers on time, compliance and safety.

The procurement of overseas engineering materials refers to the process in which the engineering contractor selects and purchases materials, equipment and materials to meet the needs of overseas engineering project.

Material Supply Process

How to ensure the legality of material supply for overseas projects?
22
Understand the materials needed for overseas engineering and find suitable suppliers in China.
22
Handle relevant customs declaration procedures, such as materials, construction equipment and living supplies in the contract, and provide relevant documents, including commercial invoice, export license and other relevant certificates, packing list, customs declaration, contract, etc. Prepare the documents required for customs clearance. If there are special requirements, provide relevant certificates to conduct certification, such as CCPIT certificate of origin, partial cargo certificate and third -party inspection certificate.
22
The most critical work for the compliance and legality of overseas project material procurement is to meet the needs of project, select strong logistics suppliers ,conduct inspection on the third party, and fully grasp the policy changes of the local customs.

How Does Mingyang Group Service

Browse Our Product Categories

  Bulldozer

  Excavator

  Paver

  Water Truck

  Dump Truck

  Mining Truck

   Tel:00852-56158988

  Email:my@ymo.hk

    Add:Room S032, 2/F, The Capital 61-65 Chatham Road South, Tsim Sha Tsui, Kowloon, Hong kong.

Project
Project Case
About Us