Electric Forklift Project
Home » Project Case » Electric Forklift Project

Recently, our company successfully completed the shipment of electric forklifts ordered by overseas project. Which arrived at the port smoothly.

Project Profile

In order to ensure high quality delivery of this order, our company has conducted in-depth communication with the customer from the beginning of receiving the demand, and accurately grasped the specific needs of the customer in terms of environment and work intensity, and customized suitable electric forklifts for them.

Quality Assurance

The electric forklifts integrate a series of core technological advantages, superior performance, energy efficiency, easy operation, safety and reliability and other features. It is worth mentioning that its lithium battery supports fast charging technology, and with the low-temperature automatic heating function, it can still maintain stable performance in hot and humid climate, saving more than 70% energy compared with traditional fuel forklift; and the intelligent safety system equipped in the vehicle can adapt to the extreme environment from 20℃ to 45℃.

This cooperation not only reflects our strength, but also resonates with China's "dual carbon" strategy and the market trend of green transformation. We believe that with the joint efforts of both parties, we will be able to realize mutual benefits and create more value!

The procurement of overseas engineering materials refers to the process in which the engineering contractor selects and purchases materials, equipment and materials to meet the needs of overseas engineering project.

Material Supply Process

How to ensure the legality of material supply for overseas projects?
22
Understand the materials needed for overseas engineering and find suitable suppliers in China.
22
Handle relevant customs declaration procedures, such as materials, construction equipment and living supplies in the contract, and provide relevant documents, including commercial invoice, export license and other relevant certificates, packing list, customs declaration, contract, etc. Prepare the documents required for customs clearance. If there are special requirements, provide relevant certificates to conduct certification, such as CCPIT certificate of origin, partial cargo certificate and third -party inspection certificate.
22
The most critical work for the compliance and legality of overseas project material procurement is to meet the needs of project, select strong logistics suppliers ,conduct inspection on the third party, and fully grasp the policy changes of the local customs.

How Does Mingyang Group Service

Browse Our Product Categories

  Bulldozer

  Excavator

  Paver

  Water Truck

  Dump Truck

  Mining Truck

   Tel:00852-56158988

  Email:my@ymo.hk

    Add:Room S032, 2/F, The Capital 61-65 Chatham Road South, Tsim Sha Tsui, Kowloon, Hong kong.

Project
Project Case
About Us